Cooling Tower Installation and Piping work

Cooling Tower Installation and Piping work

Scope

Cooling tower installation was a challenging work undertook by us, work involved the assembly of the cooling tower, fabrication of its resting platform which was designed to hold the weight of both the cooling tower with its overhead platform and 8-inch header pipeline.

We were also to fabricate and lay the pipeline from the plants' production unit to the cooling tower and also the pipeline to the chillers from the cooling tower. In addition to this Pump platform, strainer and valves were installed as per requirement.

  • Client: Henkel Polybit
  • Location: Umm Al Qwain